Download Print this page

Teledyne ASX-560 Installation Manual page 11

Hide thumbs Also See for ASX-560:

Advertisement

6
Connect two pieces of
3
connectors of the rinse station.
When first setting up the system, use two separate drain tubes. If the flow rate
is low enough, and if the waste container is very close to the autosampler, it
may be possible to join the tubes with a Y connector.
Ensure that the tubing outlet is placed so that it will remain above the surface
of the liquid in the waste container. If the end of the tube is immersed, the
waste solution might back up and overflow. If necessary, cut the tubing to a
shorter length.
7
Once the autosampler has been set up and connected to a computer, use the
ÄSX Dashboard software to enable the dual-rinse option and adjust the timing
and flow rate.
EAR99 Technology Subject to Restrictions Contained on the Cover Page.
/
inch (4.8 mm) ID drain tubing to the upper
16
11

Advertisement

loading

This manual is also suitable for:

Asx-280