Dealer Maintenance Schedule - Savaria Track Bridge Owner's Manual

Ceiling lift
Table of Contents

Advertisement

Dealer Maintenance Schedule

Perform the checks/actions listed in the Operator Maintenance Schedule as
well as those listed in the table below.
Dealer Check/Action
Check all inside hardware to ensure it is properly tightened
Check the connection points of the tracks to the track
bridge
Check the wiring and connectors for proper connection
Perform a load test on the track bridge and track system
with the Safe Working Load
To avoid potential injury, use ONLY Savaria parts when
replacing parts.
To prevent the person from falling (or objects from
falling) that may cause injuries to the person, the
operator or other persons, always reinstall the track end
stops if they were removed for servicing. Note that the
recommended tightening torque for the track end stop is
20 N-m (15 lb-ft). Figure 12 shows the track end stop.
Figure 12
Part No. 001300-EN, 10-m10-2023 Track Bridge /Track Bridge Bariatric Owner's Manual
WARNING
TRACK END STOP
Frequency
Every year
Every year
Every year
Every year
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Track bridge bariatric

Table of Contents