Power Planning; Power Usage - Emerson FB3000 Instruction Manual

Remote terminal unit (rtu)
Hide thumbs Also See for FB3000:
Table of Contents

Advertisement

FB3000 RTU Instruction Manual
D301851X012
November 2023
Figure 2-17. External Power Connections
1
2
Note
If your installation includes multiple chassis, wire power only to the left-most (base)
chassis.
Note
If your FB3000 does not power on, check that the polarity of the DC input voltage wiring
connections match
internal fuse and switch to protect the device from damage. Once the polarity is corrected,
the switch will reset automatically to allow for proper operation.
2.8.2

Power Planning

Table 2-2
Table 2-2. Power Usage
Cfg#
1
2
3
4
5
24
Input power from external power supply (power for RTU)
Loop power from external power (power for field devices)
2‐16. If you accidentally reversed the polarity, it triggers an
Figure
shows some examples of power needed for various configurations.
Configuration
3CPU16 & 3CPUSG Only: 4x 4088s, FBxConnect on
USB, 1 second IO scan rate (COM 1/2, ETH 1/2,
disabled)
CFG 1 plus 3MIX12 & 3MSG12 in slot 2:
AIDIPI configured as DI with 66uA pull-up (AOs,
Loop Supply disabled)
CFG 2 plus 50ms IO scan rate
CFG 3 plus COM1, COM2, ETH1 enabled:
COM1, COM2, ETH1, USB running FBxConnect,
50ms IO scan rate
CFG 4 plus 6 additional 3MIX12 & 3MSG12 cards:
Each IO card configured as 4 AI's 4 PI's, 1 AO
Current, 1 AO Voltage, 2 DO's toggling 1s ON 1s
OFF, 10ms IO scan rate
Power
Power
(12V)
(24V)
1.464W
1.608W
2.448W
2.784W
2.556W
3.072W
4.356W
4.560W
18.62W
18.69W
Installation

Advertisement

Chapters

Table of Contents
loading

Table of Contents