Electrical installation
Installer reference guide
132
If the switch box is lowered in service position while the electrical installation is
done, additional cable length has to be taken into account adequately. The cable
routing in normal position is longer than in service position.
All cables which will be connected to the switch box of the ECH
strain relief.
O must be fixed by
2
ERLA11~16D + EBSH/X(B)11+16P30+50D
Daikin Altherma 3 R ECH₂O
4P663482-1C – 2023.05