Fire And Fireplace Safety (Safety Inputs, Dampers) - Salda AMBERAIR COMPACT S-CX H Operation, Installation & Maintenance Instructions

Table of Contents

Advertisement

4.16.2. FIRE AND FIREPLACE SAFETY (SAFETY INPUTS, DAMPERS)

Product AmberAir Compact can be equipped with fire dampers for extract and supply air.
Dampers are controlled by Spring-return actuators (A1, A2). Upon activation of signals EX2 DO1 and EX2 DO2 the dampers shall open. When
EX2 DO1/DO2 is deactivated, the dampers shall close. Fire dampers must be equipped with damper position switches. When the dampers
completely close, the switches K6/K8 should be activated. When the dampers are completely open, switches K5/K7 should be activated. MCB
controller can be configured to operate with NO or NC switches.
For fire safety function it is available to connect the external switch FA (i.e., smoke detector) to MCB DI4 input. By default, unit's controller is con-
figured to operate with NC fire safety switch. As long as the fire protection device is not connected to the ventilation unit, on an input there must
be a factory-installed jumper.
For the fireplace protection function, it is also possible to connect external fireplace protection switch FAA to MCB DI8 input. By default, the unit's
2
3
controller is configured to operate with NO fireplace protection switch and it can be reconfigured.
-N3
EX2 V1.0
230V ON/OFF
230V ON/OFF
Spring back
Spring back
-A1
-A2
+UC
Fig. 4.16.2.1 Fire dampers and position switches connection
AMBERAIR COMPACT S-CX v2023.3
4
5
+CB
-N2
EX1 V2.0
NC
NO
NC
NO
-K5
-K6
COM
COM
NC
NO
NC
NO
-K7
-K8
COM
COM
Air dampers (Electrical unit)
MCB Connections wired by the user
Connections principal scheme
1
2
6
A1
-FA
A2
Jumper*
*Jumper wired by manufacturer
+UC
Fig. 4.16.2.2 Fire and fireplace safety switch con-
EI O. Drąsutis
DRAWN BY
EI D. Aleksandravičius
CHECKED BY
APPROVED BY
3
7
8
+CB
+CB
-N1
-N2
EX1 V1.0
MCB V1.0
-N3
EX2 V1.0
-FPP
230VAC
230VAC
-ST1
-ST2
ON/OFF
ON/OFF
or
or
OPEN/CLOSE
OPEN/CLOSE
+UC
nection
DUTIES / NAME
SIGNATURE
Digital inputs and outputs
Connections principal scheme
4
5
9
DATE
UAB"SA
2023-03-27
2023-03-27
2023-03-27
EN |
17

Advertisement

Table of Contents
loading

Table of Contents