Hardware Installation
Installing the Chassis
Preparations
Tip: Read the Hardware Installation Manual if you install the switch for the first time.
Safety Notes
Do not install the switch in a wet place and keep it away from liquid.
Do not wear loose clothes during installation to avoid hooking components and causing damage.
Therefore, fasten clothes ribbons, scarves, and sleeves.
Place tools and components away from passageways to prevent collision.
Check for potential risks in the working area, for example, ungrounded power supplies, unreliable
grounding of power supplies, or wet floor.
Ambient Requirements
Temperature: 0C to 45C
Relative humidity: 10% to 90%
Cleanness: ≤ 1.4×10
Ventilation: at least
Anti-interference: far away from high-power (radar or radio transmitting station), high-frequency, or
large-current devices
to a Specified
Position
(particle diameter ≥ 5 μm)
5
20 cm
clearance around the chassis for efficient heat dissipation
Installing Power
Grounding
Modules or Cards
Checking
Need help?
Do you have a question about the RGOS 11.X and is the answer not in the manual?