Download Print this page

Hardware Installation - Ruijie RGOS 11.X Installation Manual

High-end data center switches

Advertisement

Hardware Installation

Installing the Chassis
Preparations
Tip: Read the Hardware Installation Manual if you install the switch for the first time.
Safety Notes
 Do not install the switch in a wet place and keep it away from liquid.
 Do not wear loose clothes during installation to avoid hooking components and causing damage.
Therefore, fasten clothes ribbons, scarves, and sleeves.
 Place tools and components away from passageways to prevent collision.
 Check for potential risks in the working area, for example, ungrounded power supplies, unreliable
grounding of power supplies, or wet floor.
Ambient Requirements
 Temperature: 0C to 45C
 Relative humidity: 10% to 90%
 Cleanness: ≤ 1.4×10
 Ventilation: at least
 Anti-interference: far away from high-power (radar or radio transmitting station), high-frequency, or
large-current devices
to a Specified
Position
(particle diameter ≥ 5 μm)
5
20 cm
clearance around the chassis for efficient heat dissipation
Installing Power
Grounding
Modules or Cards
Checking

Advertisement

loading
Need help?

Need help?

Do you have a question about the RGOS 11.X and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

N18000-x