Download Print this page

Hardware Installation - Ruijie RG-S6220-H Series Installation And Initialization

Data center switches

Advertisement

Preparations
Tip: Read the RG-S6220-H Series Switches Hardware Installation Manual if you install the switch for the first time.
Safety Notes
 Do not install the switch in a wet place and keep it away from liquid.
 Do not wear loose clothes during installation to avoid hooking components and causing damage. Therefore, fasten
clothes ribbons, scarves, and sleeves.
 Place tools and components away from passageways to prevent collision.
 Check for potential risks in the working area, for example, ungrounded power supplies, unreliable grounding of power
supplies, or wet floor.
Ambient Requirements
 Temperature: 0C to 50C [AsRG-S6220-48XT6QXS-H generates more heats than the other models, its operating
temperature should in the range of 0C to 45C.]
 Relative humidity: 10% to 90%
 Cleanness: ≤ 310
 Ventilation: at least
 Anti-interference: far away from high-power (radar or radio transmitting station), high-frequency, or large-current
devices

Hardware Installation

Installing the
Chassis to a
Specified Position
(particle diameter ≥ 5 μm)
4
20 cm
clearance around the chassis for efficient heat dissipation
Installing Power
Modules or
Grounding
Extension
Modules
Checking

Advertisement

loading
Need help?

Need help?

Do you have a question about the RG-S6220-H Series and is the answer not in the manual?