Ruijie RGOS 11.X Installation Manual page 12

High-end data center switches

Advertisement

Hardware Installation
Installing the
Installing Power
Preparations
Chassis to a
Grounding
Checking
Modules or Cards
Specified Position
Checking the Cabinet
Ensure that the external power supply system matches the power distribution panel of the
cabinet.
Ensure that the front and rear doors of the cabinet can be closed with the switch in the cabinet.
Ensure that the cabinet is securely fixed and will not move or fall down.
Ensure that the switch is securely fixed in the cabinet and that all cables are bundled on the
cabinet.
Ensure that sufficient space is reserved around the switch for heat dissipation, especially at the
front and rear of the switch (at least 20 cm).
Checking Cable Connections
Ensure that optical fibers and twisted pair cables match the connected interfaces.
Ensure that all cables are bundled properly.
Ensure that ground cable specifications and connection are correct.
Check whether that all the cables are routed indoors. If any cables are routed outdoors, check
whether AC power supply surge protection bars and network interface surge protectors are used.
Checking the Power Supply System
Ensure that all power cables are properly connected and meet security requirements.

Advertisement

loading
Need help?

Need help?

Do you have a question about the RGOS 11.X and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

N18000-x