Download Print this page

Ruijie RG-S6220-H Series Installation And Initialization page 6

Data center switches

Advertisement

Preparations
Installing the Switch on a Desk (When Cabinet Mounting Cannot Be Implemented)
① Attach the four adhesive rubber pads delivered in the carton to the recessed areas at the four
corners of the chassis bottom.
② Place the switch on the desk. Ensure steadiness of the desk and leave sufficient clearance around
the switch for ventilation.
Caution: Do not place heavy objects on the switch.
Note: When the three fans in an RG-S6220-H switch fan run at full speed, they produce noise of 80 db
(complying with the noise standard for an unattended equipment room). The fan speed will be
automatically adjusted based on ambient temperature after startup of the switch. Installing the switch in
an office is not recommended. When the ambient temperature is around 25
The fan rotates faster when the temperature is higher.
Hardware Installation
Installing the
Chassis to a
Specified
Position
Installing Power
Modules or
Grounding
Extension
Modules
Checking
o
C, the noise is 50-55 db.

Advertisement

loading
Need help?

Need help?

Do you have a question about the RG-S6220-H Series and is the answer not in the manual?