Download Print this page

Ruijie RG-RSR77 Series Installation And Initialization page 4

Advertisement

Hardware Installation
Preparations
Safety Notes
Do not install the devices in a wet place and keep them away from liquid.
Keep routers away from heat sources.
Check that routers are properly grounded. Do not remove cables when the power is not interrupted.
Wear an ESD wrist strap during installation and maintenance.
Do not wear loose clothes during installation to avoid hooking components and causing damage.
Therefore, fasten clothes ribbons, scarves, and sleeves.
Place tools and components away from passageways to prevent collision.
It is recommended that UPSs be used to prevent power interruption and power interference.
Ambient Requirements
Temperature: 0℃ to 45℃
Relative humidity: 10% to 90%
Anti-interference: far away from high-power, high-frequency, or large-current devices
Installing the
Grounding
Chassis to a
Specified
Connecting
Position
Installing the
and
Supervisor
and Cards
Cables
Power-on
Check

Advertisement

loading
Need help?

Need help?

Do you have a question about the RG-RSR77 Series and is the answer not in the manual?