ASSEMBLY INSTRUCTIONS
STEP 1: Install meter pillars and the meter
a)
Let the communication line pass through the right meter pillar.
b)
Put meter pillars on the base frame. First, use 2 Screw M8*20 and 2 washers;second, use 2 Screw
M8*60, 2 washers and 2 nuts to fasten meter pillars. (Don't tighten screws at first).
Use 4 Screw M8*20, 4 washers and 2 nuts to fasten the meter. (Don't tighten screws at first).
c)
d)
Turn power on and start the machine. If all functions work well, tighten all screws.
STEP 2: Remove the screw in base frame
Remowe
screw
the