GE Innova IGS 520 Preinstallation Manual page 237

Table of Contents

Advertisement

Chapter 7 Appendix
1 PIST0021 - US Fluoro UPS and PDB connection
1.1 Personnel Requirements
Personnel
Requirements
1
1.2 Preliminary Requirements
1.2.1 Tools and Test Equipment
Item
Standard Service
Engineer's toolkit
1.2.2 Required Conditions
The PDB is already installed
Power cables are as follows: (1) From
PDB to UPS rectifier input = 4x6 AWG
recommended (4x3 AWG max) (3ph +
PE). (2) Bypass = 5x8 AWG
recommended (5x3 AWG max)(3ph + N
+PE). (3) From UPS output to PDB = 5x8
AWG recommended (5x3 AWG max)(3ph
+ N+PE)..
Cable sizing shall follow local
requirements.
Power cable Mechanical Terminals
Torque Specification: < 3 Nm / < 27 lb.in
for 20 AWG to 3 AWG.
Check the UPS shipping date marked on
the packaging label. Commissioning of the
UPS must be performed within 3 months
after that date.
Chapter 7 Appendix
Innova
IGS 520, Innova
TM
Preliminary Reqs
Not Applicable
Qty
1
Condition
IGS 530, Innova
TM
Procedure
1 hour
Effectivity
-
Reference
-
-
-
-
-
IGS 540 Pre-Installation Manual
TM
Direction 5499972-1-1EN, Revision 2
Finalization
Not Applicable
Part#
Manufacturer
-
Effectivity
-
-
-
-
-
-
237