GE Innova IGS 520 Preinstallation Manual page 131

Table of Contents

Advertisement

3.2 Floor Requirements
3.2.1 Floor requirements when using provided floor anchors
The maximum pullout force per provided anchor was calculated assuming:
A concrete compression strength of 17.24 MPa at 28 days (which is the minimum required
compression strength).
Anchors installed to the required hole depth of 165.1 mm minimum, and
Center of anchor hole to concrete edge distance 79.4 mm.
Make sure to obtain data on compression strength of the concrete before using floor anchors.
3.2.2 Pan Type Floor Construction Requirement
For Pan type floor construction, steel channels must be designed by a local structural engineer
to span floor joists. See
NOTE:
For specific floor preparation procedures, refer to
Procedures .
Illustration 2-68: Through–Bolt Supplied (Pan Type Floor Construction)
Chapter 2 Equipment Requirements
Innova
IGS 520, Innova
TM
Illustration
2-68.
IGS 530, Innova
IGS 540 Pre-Installation Manual
TM
TM
Direction 5499972-1-1EN, Revision 2
Pre–Installation Kit Installation
131

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova igs 530Innova igs 540

Table of Contents