NOTE:
Specific Recommendations for installation with GE ECG Device such as MacLab,
CardioLab or ComboLab:
NOTE:
MEDRAD Avanta Table mount with floor Medrad bracket (this configuration is not
authorized with an Tilting table): A 76.2 mm (3 in) and max 25 m (984 in) length
conduit between technical room and patient room shall be prepared below the floor for
the three injector cables. It is recommended to use the MEDRAD Avanta floor
mounting bracket to cover the duct hole in the patient room if there is no gases box.
Floor mount installation can be accomplished one of two ways:
Connectors mounted in trough under mounting bracket (Figure 1)
Connectors mounted above mounting bracket (Figure 2)
For further MEDRAD Avanta floor mounting, see the Installation guide MEDRAD Avanta Floor
Mounting Bracket.
Chapter 5 Electrical Requirements
Innova
IGS 520, Innova
TM
TRAM RAC in Exam Room with cable 2016134-106 routed back to Control Room
where the other modules & PC are installed
If no GE Maclab cable 2016134-106 installed between the TRAM (Exam Room)
and the Control Room, need to route it so that installation/connection of Physio
module can be made in Control Room.
Illustration 5-17: MEDRAD Avanta mounting bracket
Illustration 5-18: MEDRAD Avanta floor mounting methods
IGS 530, Innova
IGS 540 Pre-Installation Manual
TM
TM
Direction 5499972-1-1EN, Revision 2
225

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova igs 530Innova igs 540

Table of Contents