these filters can cause reduced speed at the air inlet. The size of the air inlet has therefore to be
dimensioned accordingly.
NOTE:
Refer to the Large Display Subsystem vendor Service manual for more details
3.5 Vivid E9 Ultrasound Option
Heat Dissipation for Vivid E9 system is 3800 BTU/h.
194
Innova
IGS 520, Innova
TM
NOTICE
If installed in the technical room, the Large Display Cabinet may impact its layout.
It may also be installed in a separate technical room. This depends on hospital
constraints, local regulations or EHS rules. Clearance, weight of Large Display
Cabinet, airflow and cooling system should be adapted for the Large Display
Cabinet.
Make sure that local regulations have been applied for the installation of the
Large Display Cabinet (dedicated room/fire detection etc.)
NOTICE
Ventilation instructions:
The Large Display Cabinet must be placed in a sufficiently ventilated area;
the ambient temperature should not exceed 95°F (35°C).
Clearance around the front of the unit should be sufficient to enable free
passage of personnel with the doors fully open, and to allow sufficient airflow
to the door vents – Min. 100cm / 40"
It is important that air can move freely around and through the LD Cabinet.
Do not block the air vents.
Avoid locations in direct sunlight or near heat sources.
IGS 530, Innova
IGS 540 Pre-Installation Manual
TM
TM
Direction 5499972-1-1EN, Revision 2