Hardware Installation and Reference Guide
fiber optic cable or plugged with a dust cover to prevent dust from entering and burning
people's eyes.
Do not look directly into the SFP port.
Danger
Do not approach or look directly into the SFP port in any situation to avoid permanent damage
to your eyes.
Storage Security
1.5.6
To ensure the normal operation of the device, maintain an appropriate temperature and
humidity in the storage room. Please comply with the storage temperature and humidity
requirements demonstrated in the device specifications.
Caution
If the device has been stored for more than 18 months, please power on the device and keep it
running for 24
hours to activate the device.
Installation Environment Requirements
1.6
The device must be used indoors to ensure normal operating and prolong its service life.
The installation site should meet the following requirements.
Load-bearing Requirements
1.6.1
Evaluate the floor load-bearing requirements according to the actual weight of the installed
device and its accessories (such as cabinets, chassis, and power supplies), and ensure that the
load-bearing capacity of the installation site meets the requirements.
Ventilation Requirements
1.6.2
Reserve the position for vent to ensure heat dissipation. After connecting all cables, arrange
them into bundles or place them on the cable distribution frame to avoid blocking the air inlet.
Space Requirements
1.6.3
To ensure sufficient operating space for chassis moving and module insertion and maintenance,
it is recommended that the width of the aisle in the equipment room be not less than 0.8 m.
To facilitate heat dissipation and maintenance of the device, do not install the device against the
wall. Leave a certain space (not less than 0.4 m) for the left and right panels to facilitate heat
dissipation.
9
Installation Preparation
Need help?
Do you have a question about the RG-AM5528-SF and is the answer not in the manual?