Power Down The Server; Open The Cable Management Arm - Hitachi HA805 G3 Series User Manual

Advanced server
Table of Contents

Advertisement

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical server data and
programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method activates a controlled shutdown of applications and the OS before the server enters standby mode. It can also
activate a shutdown behavior governed by an OS configuration or policy.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If an application
stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO 6.
This method initiates a controlled remote shutdown of applications and the OS before the server enters standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is amber.

Open the cable management arm

Procedure
1. Press and hold the blue PUSH button on the retention bracket.
2. Swing the arm away from the rear panel.
Operations 40

Advertisement

Table of Contents
loading

Table of Contents