Installing an energy pack on the chassis
Prerequisites
Before you perform this procedure:
•
Make sure that a SR/MR type-p or MR type-o storage controller is installed.
•
Make sure that you have the following items available:
◦
Storage controller backup power cable (ships with the storage controller)
◦
Energy pack option
◦
Energy pack extension power cable
Procedure
1.
Power down the server.
2.
If installed, open the cable management arm.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
Place the server on a flat, level work surface.
7.
Remove the access panel.
8.
Install the energy pack:
a. Attach one end of energy pack on the chassis (callout 1).
b. Press and hold the retention latch (callout 2).
c. Pivot the energy pack downward and release the retention latch (callout 3).
Hardware options installation
133