Operations

Power up the server

About this task
To power up the server, use one of the following methods:
Press the Power On/Standby button.
Use the virtual power button through iLO.

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical
server data and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method activates a controlled shutdown of applications and the OS before the server enters standby
mode. It can also activate a shutdown behavior governed by an OS configuration or policy.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby
mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If
an application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server enters
standby mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is
amber.

Extend the server from the rack

About this task
WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending anything from the rack.
Procedure
1. Pull down the quick release levers on each side of the server.
2. If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.