4.14.2 Indoor unit
To open the front panel
RXM20~71R(9) + ARXM25~71R(9) + FTXM20~71R + ATXM25~50R +
FVXM25~50A
Split New Perfera R32
ESIE20-11B – 2022.02
a Cable tie
b Switch box
7 Install the insulation on the upper side of the switch box.
a Insulation
b Main PCB
ATXM-R and FTXM-R units
1 Hold the front panel by the panel tabs on both sides and open it.
Floor standing units
1 Slide both sliders in the direction of the arrows until they click.
b
b
a
4
Components
|
a
Service manual
159