Siemens PELTON & CRANE Light Fantastic II Installation Instructions Manual page 7

Table of Contents

Advertisement

10"
(25.4 cm)
64"
(162.6 cm)
(PREDRILLED)
8-5/8"
(21.9 em)
60° MIN.
(152,4 cm)
(NEW HOLES)
67" MAX.
(170.2 cm)
1/4 DIA. x 47
LONG LAG SCREW
(NOT FURNISHED)
D
z
13.
/
C
Nu
i
mt
4
ii
gg
|
Pr
|
LI
Ι
8-5/8"
60" (152.4 cm)
(21.9 ст)
MIN.
67" (170.2 cm)
MAX.
mi
5
(152.4 cm)!
!
8-5/8"
MIN.
(21.9
cm)
67"
(170.2 cm) —2%|
MAX.
mee
(NEW HOLES)
ea
1 2.
A
ο
EMBED SCREW AT
(6.4 cm)
LEAST 2-1/2* (6.4 em) <|
INTO SOLID WOOD
|
=
\
ANNEE
17/64" (.57 cm) DIA. —
H T
314º (1.9 em) —
2
LFTII (TRACK LIGHT) INSTALLATION,
continued
12. NOTE: Normally, further disassembly of the
track is not necessary for installation. If addi-
tional mounting fasteners are required, drill
and counterbore holes in plywood mounting
pallet A as shown.
Continue installation using one of the three mounting
situation instructions following.
Ensure ceiling substructure is firmly secured to
support approximately 200 pounds live load. Use
fasteners such as screws and bolts to secure the
substructure rather than fasteners such as nails
or glue.
13. Using four predrilled holes B in plywood pallet
(3/4"
x10"
x 76-13/16") mount to perpendic-
ular wood
joists C with four 1/4"
x4"
lag
screws D.
NOTE: Drill additional holes E
if necessary.
Ensure pallet is level.
nti
rall
i s t s
Il
14. Install cross bracing F between the parallel joists
G as shown. Ensure ceiling substructure is firmly
secured to support approximately 200 pounds.
15. Using four predrilled holes H in plywood pallet
(3/4"
x10"
x 76-13/16"), mount to cross
bracing F with four 1/4"
x4"
lag screws D.
NOTE: Drill additional holes | on bracing
joists F if necessary.
Ensure pallet is level.

Advertisement

Table of Contents
loading

Table of Contents