Siemens PELTON & CRANE Light Fantastic II Installation Instructions Manual page 12

Table of Contents

Advertisement

SINGLE LIGHT
ENTER LINE OF CHAIR BASE
LEFT HAND COLUM|
>
1
5
-
ia
24"
(61 cm)
+ 12" (30.5 cm)
12" (30.5 em)
2.
DUAL LIGHT
18"
(45.7 cm)
RD E.
METHOD A
PREDRILL THREE 3/16" HOLES
FOR 1/4"
LAG BOLTS
L
一 一 一 一
CROSS BLOCKING
METHOD C
ARMORED CABLE FROM
ELECTRICAL OUTLET BOX
RIGHT HAND COLUMN
CENTER LINE OF CHAIR BASE
METHOD B
(61 cm)
24"
(61 ст)
DE
LFCII (COLUMN LIGHT)
INSTALLATION
NOTE: If desired, tripod cover and col-
umn assembly may be ordered and
installed before finished ceiling is in
place. For new construction, a mounting
plate assembly (007257) may be ordered
to facilitate installation.
Recommended ceiling positions for various
methods of LFCII operation are shown.
Location may be varied. Obtain approval
from doctor before locating framing and
electrical outlet.
NOTE: The maximum
height the LFCII
may be mounted is 13'
(396.2 cm). How-
ever, Pelton & Crane does not recom-
mend any mounting in excess of 10'
(304.8 cm).
Framing
Provide adequate framing to support
approximately
200
pounds dead
load.
Locate framing so ceiling joists A and block-
ing between joists are positioned so that
mounting bolts through legs of tripod can be
screwed directly into framing.
Wiring
Stub out 3/8"
flexible armored conduit
from electrical box in ceiling to location as
shown. A 1.6 amp, 120 VAC, 60 Hz electri-
cal supply line is required for the LFCII, or a
3.2 amp, 120 VAC, 60 Hz line for the LFCII-
D.
Protect circuit with a 15 amp fuse or circuit
breaker. (Also refer to LFCII and LFCII-D
installation Template, 096021).