Siemens PELTON & CRANE Light Fantastic II Installation Instructions Manual page 13

Table of Contents

Advertisement

120V,
60 Hz
ELECTRICAL SOURCE
4
A
NEUTRAL
LINE
(BLACK)
(WHITE)
ELECTRICAL
BOX
120V, 60 Hz
ELECTRICAL SOURCE
PTS
NEUTRAL
LINE
(WHITE)
(BLACK)
| 1
A
NEUTRAL
(WHITE)
LINE
(BLACK)
TO LIGHT
WHITE
ELECTRICAL
BOX
NEUTRAL
(WHITE)
LINE
(BLACK)
J
TO LIGHT
80" (203.2 cm)
TO FLOOR
75" (190,5 cm)
TO FLOOR
TO FLOOR
51" (129.5 cm)
12
LFCII (COLUMN LIGHT)
INSTALLATION, continued
4.
Attach conduit to connector on
ceiling plate. See wiring dia-
gram of power supply entering
electrical or switcn box. Install
wall switch A between power
supply and transformer. Wall
switch can be switched off dur-
ing electrical storms to prevent
transformer damage caused by
voltage overloads.
Tripod and Column Installation
5.
Drill three 3/16"
pilot holes B
to mount lag bolts.
6.
Drill three 3/4"
holes C
through sheet-rock, acoustical
tile or plaster.
NOTE: For electrical supply
connections, use wiring suit-
able for at least 90°C (194°
F)
7.
Secure tripod D and ceiling
plate E to framing with 1/4"
x
4"
lag bolts F and washers
G. The 3/4"
diameter spacers
H should be in direct contact
with the framing. Insert ceiling
plate between the 3/4"
spacers and adjusting nuts I.
NOTE: If spacers rest against
soft sheetrock, acoustical
tile or plaster, the light may
be unstable.
8.
Connect tripod wires to electri-
cal supply wires in armored
cable J with wire nuts K. Con-
nect ground wire L to tripod
with screw and washer.

Advertisement

Table of Contents
loading

Table of Contents