LFCII (COLUMN LIGHT)
INSTALLATION, continued
Column Installation
9. Screw end of column A
into tripod B. Insert
and tighten both locking set screws C
in tri-
pod.
10. Place a piece of electrical tape around a
1/8" drill bit to mark depth to which pilot hole
is to be drilled.
11. After locating the 3/32" pilot hole in the tri-
pod, drill a 1/8" hole through tripod/column
assembly.
Failure to mark drill bit, or failure to control
depth of drill bit may result in electrical wir-
ing damage and subsequent electrical
shock.
12. Drive in roll pin D flush with outside edge of
tripod.
Set screws must be tightened securely and
roll pin installed to prevent column from
unscrewing during operation. Failure to
install roll pin and tighten set screws
securely could result in light falling from
ceiling.
13. Ensure column is plumb. Adjust leveling
nuts E on tripod until column is plumb.
Loosen lag bolts F slightly before making
adjustment. When column is vertical,
securely tighten lag bolts.
14. Slip cover G and collar H up column and
tighten two set screws I.