LFTII (TRACK
LIGHT) INSTALLATION,
continued
Arm
Assembl
tallation —
Il
27. Remove stop screw from arm mounting col-
lar.
Raise LFTII arm assembly close to column.
28. Connect electronic phase control to wiring in
arm mounting collar with 4-pin Mate-n-Lok®
connector.
29. Screw arm mounting collar to column.
30. Insert and tighten two column adapter set
screws. Thread on column should not show.
31. Replace stop screw to prevent more than
360°
rotation.
If column stop adjustment location is
required, see adjustment section.
NOTE: Column stop adjustment must be
performed before installation of roll pin.
Arm
mbly
— LFTII
Set screws must be tightened securely and
roll pin installed to prevent column from
unscrewing during operation. Failure to
install roll pin and tighten set screws
securely could result in light falling from ceil-
ing.
32. Place a piece of electrical tape around a 1/8"
drill bit to mark depth to which pilot hole is to
be drilled.
33. Locate 3/32"
pilot hole opposite set screw
in column adapter and drill a 1/8"
hole
through the adapter/column assembly using
drill bit.
AWARNING
Failure to mark drill bit, or failure to control
depth of drill bit may result in electrical wir-
ing damage and subsequent electrical shock.
34. Drive in roll pin flush with outside edge of col-
umn adapter.
Make sure trolley rolls freely. For adjustment
of trolley, refer to Adjustment section.
35. Apply power to LFTII. Inspect operation by
turning on light and
rotating dimmer control
at base of column from lower to higher light
intensity limits.