Screws
Washers

Selecting a site

WARNING: To prevent fire or electric shock, install the unit in a temperature- and humidity-controlled indoor
environment, free of conductive contaminants.
When selecting a site, consider the following factors:
Elevated operating ambient temperature—If the equipment is installed in a closed or multiunit rack assembly, the
operating ambient temperature of the rack environment might be greater than room ambient temperature. Install the
equipment in an environment compatible with the operating temperature. For more information, see Environmental
specifications.
Reduced air flow—In the rack, the rate of air flow required for safe operation of the equipment must not be compromised.
Circuit overloading—Consideration must be given to the connection of the equipment to the supply circuit and the effect
that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of
equipment nameplate ratings must be used when addressing this concern.
Reliable earthing—Reliable earthing of rack-mounted equipment must be maintained. Particular attention must be given to
supply connections other than direct connections to the branch circuit, such as the use of power strips.
Electrical requirements—All models require a dedicated (unshared) branch circuit, suitably rated for the specific UPS as
stated in the UPS input specifications.

Preparing the equipment

Procedure
1. Check the battery recharge date specified on the label that is affixed to the shipping carton.
IMPORTANT: Do not use the battery if the recharge date has passed. If the date on the battery recharge date label
has passed without the battery being recharged, contact an HPE authorized service representative for directions.
2. Transport the packaged unit to its installation location.
3. Unpack the equipment near the rack where the unit will be assembled.
CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install the
heaviest item first, and continue to populate the rack from the bottom to the top.
17
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

G2 r6000 3u

Table of Contents