Cautions
Ensure the air flow around the front, sides, and back of the switch is not
restricted.
Ensure the cooling vents are not blocked.
Do not install the switch in an environment where the operating ambient
temperature might exceed 40ºC (104ºF).

3.1.2 Site Requirements

The device is placed on a table-top. Before installing the unit, verify that the
location chosen for installation meets the following site requirements.
General — Ensure that the power supply is correctly installed.
Power — The unit is installed within 1.5 m (5 feet) of a grounded, easily
accessible outlet 100-240 VAC, 50-60 Hz.
Clearance — There is adequate frontal clearance for operator access.
Allow clearance for cabling, power connections and ventilation.
Cabling — The cabling is routed to avoid sources of electrical noise such
as radio transmitters, broadcast amplifiers, power lines and fluorescent
lighting fixtures.
Ambient Requirements — The ambient unit operating temperature
range is 0 to 40ºC (32 to 104ºF) at a relative humidity of up to 95%, non-
condensing. Verify that water or moisture cannot enter the device casing.

3.1.3 Unpacking

3.1.3.1 Package Contents

While unpacking Cedar device, ensure that the following items are included:
The device
An AC power cable
Gigabit Managed Switch Family Installation Guide
16

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tl-sl3428Tl-sl3452Tl-sl3428Tl-sl3452

Table of Contents