Checking And Adjusting Throttle Control; Replacing Articulated Steering Bearing - Husqvarna Rider 13C Workshop Manual

Hide thumbs Also See for Rider 13C:
Table of Contents

Advertisement

Checking and adjusting throttle
control
1. Detach the locking nut (1) on the ball joint.
2. Push the lock spring (2) forwards far enough
for the spherical socket (3) to be lifted off from
the pivot on the lever (4).
3. Press the throttle pedal to the bottom and
move the lever (4) forwards as far as it goes
using a screwdriver.
4. Adjust the position of the spherical socket (3)
on the connecting rod (5) so that it just fits
over the pivot on the lever. Fit the spherical
socket on the pivot.
5. Lock the setting with the lock nut (1) and
press the locking spring (2) into position.
IMPORTANT INFORMATION
Check that the locking spring goes
through the hole in the spherical socket.
5
1

Replacing articulated steering bearing

1
• Remove the engine according to the earlier
description (see "Removing engine").
• Block up the ride-on mower in front of the
articulated steering.
2 Rider 11 and Rider 11 C
• Release the tensioning wheel spring (1).
• Release the clutch, gear and brake wire (2, 3
and 4) and remove the wires' holder plates (5
and 6).
2 Rider 13 C, Rider 15 C and Rider 16
2
3
4
• Release the tensioning wheel spring (1).
• Release the hydrostatic transmission wire (2)
from the arm (3) and the casing from the holder
(4).
• Release the cable from the neutral position
contact (5).
• Release the brake wire from the arm under the
tank and the casing's holder from the rear
frame (6).
Reparation instructions
33
English –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rider 11cRider 11Rider 15cRider 16

Table of Contents