Removal/Installation Of Gear Box; Removal/Installation Of Hydrostatic; Transmission - Husqvarna Rider 13C Workshop Manual

Hide thumbs Also See for Rider 13C:
Table of Contents

Advertisement

Removal/installation of gear box

Rider 11 and Rider 11 C
1
• Block-up the machine in front of the rear frame
and dismantle the rear wheels.
• Remove the cover from over the gear box.
2
• Release the tensioning wheel spring (1).
• Unfasten the clutch wire (2), and detach the
belt from the gear box pulley.
• Detach the gear and brake wires (3 and 4).
• Insert a garage jack under the gear box and
unscrew the gear box's five holder screws (5).
3
• Lower the garage jack and pull out the gear
box.
• Installation of the gear box is carried out in the
reverse removing gear box order
• After installation, check that the clutch, brake
and gear wires are correctly adjusted (see
"Checking and adjusting brake wire", "Checking
and adjusting gear control" and "Checking and
adjusting freewheel clutch").
Removing/installation of hydrostatic
transmission Rider 13C, Rider 15 C
and Rider 16
1
• Block-up the machine in front of the rear frame
and remove the back wheels.
• Remove the transmission cover.
2
• Release the tensioning wheel spring (1).
• Remove the fan (2), it is held by a circlip.
• Work off the drive belt (3).
• Remove the oil tank (4).
• Release the brake wire spring and remove the
brake wire from the brake lever (concealed
under the oil tank).
• Release the hydrostatic transmission link (5) in
the front ball joint.
• Remove the screw (6) holding the arm.
• Remove the freewheel clutch control (7) with its
spring.
Reparation instructions
37
English –

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rider 11cRider 11Rider 15cRider 16

Table of Contents