Program Execution - Agilent Technologies 4349B Service Manual

4-channel high resistance meter
Hide thumbs Also See for 4349B:
Table of Contents

Advertisement

Program Execution

Perform the following steps to start the adjustment program.
Install the program prior to execution. Refer to \Program Installation".
Note
1. Turn on the computer and bring up the BASIC system. Refer to the Table 1-2 for the
required language extensions.
2. Set the Mass Storage Unit Speci er to the drive/directory where the adjustment program
exists using the
MSI
3. Load the program, \
4. Execute the loaded program by pressing
In the program, the 4349B is referred as \UUT".
Note
If the adjustments being performed follow right after EEPROM replacement,
Note
change switch A2SW1-1 to \CLOSE", so that the 4349B will ignore the self
test errors at power-on. (Return the switch to the \OPEN" position when the
adjustments have been completed.) Refer to Figure B-1 for the switch location.
command.
" by pressing
ADJ4349B
LOAD "ADJ4349B"
.
RUN
(or
).
Return
Enter
4
5
4
5
Adjustments
2-5

Advertisement

Table of Contents
loading

Table of Contents