INSTALLATION

Commissioning

11.2 Water connection

The water connection of the appliance is via the non-pressurised
tap. For this, observe the tap operating and installation instruc-
tions.
f First install the tap.
f Then connect the appliance to the tap.
Property damage
!
The appliance may develop a leak and cease functioning.
f Never subject the appliance to water pressure.
f Never interchange the water connections.
Match up the colour coding on the tap water connections and the
appliance:
- Blue = cold water inlet
- Red = hot water outlet
Water connections
f For the cold water inlet: Connect the push-fit connector of the
tap to the cold water inlet of the HOT 2.6 N Premium.
f For the hot water outlet: Push the 7/16" hose of the tap onto
the nozzle of the hot water outlet on the HOT 2.6 N Premium
as far as it will go.
f Secure the connection by pushing on and securing the sup-
plied hose clip with a suitable tool.
Notice
Ensure that the water connections are not kinked during
installation. Prevent any tensioning during installation.
28
|  HOT 2.6 N Premium

11.3 Electrical connection

WARNING Electrocution
Carry out all electrical connection and installation work
in accordance with relevant regulations.
Property damage
!
The voltage specified on the type plate must match the
mains power supply.
f Observe the type plate.
The following electrical connections are permissible:
- Connection to a freely accessible standard safety socket with
matching plug.
12. Commissioning
WARNING Electrocution
Commissioning may only be carried out by a qualified
contractor in accordance with safety regulations.
Notice
During initial start-up and following prolonged power
supply interruptions (approx. 8 hours), you must set the
day of the week and the time.

12.1 Initial start-up

1.
f On the tap, open the draw-off valve for hot water. Observe
the tap instructions when doing so.
f Leave the draw-off valve open until water comes out without
bubbles (at least 3 minutes).
f Check the entire hydraulic installation for tightness.
f Insert the plug into the standard safety socket.
Notice
If you fail to follow the correct sequence (first water, then
power), the boil-dry protection check will respond.