INSTALLATION

PREPARING fOR INSTALLATION

9.
Preparing for installation
9.1

Fitting the thermal insulation, if appropriate

f Position the appliance in its intended site.
f
f Fit the thermal insulation according to the instructions sup-
f
plied. For this, ensure that there is enough space for the
installation task. You can then link the appliance into the
heating and DHW system.
9.2

Fitting the signal anode

Material damage
!
When operating the cylinder without consumption indica-
tor, leave the plug in the threaded hole.
f Pull the plug out by simultaneously pushing the pressure
f
ring down.
f Push the open pipe end of the consumption indicator into the
f
aperture of the anode.
9.3
Fitting the thermometer and temperature
sensor
f Insert the thermometer as far as it will go and align it.
f
f Insert the temperature sensor into the sensor pipe as far as it
f
will go. Apply heat conducting paste.
9.4

Fitting the heat transfer station, if appropriate

f Install the charging station in accordance with the operating
f
and installation instructions supplied.
9.5
Fitting the flanged immersion heater, if
appropriate
f Remove the dummy flanges to install flanged immersion
f
heaters in accordance with the operating and installation in-
structions supplied. Maintain the DC separation towards the
cylinder.
20
| SBB 751-1001 | SBB 751-1001 SOL
9.6
Fitting the water connection and the safety
assembly
9.6.1 Safety instructions
Note
Carry out all water connection and installation work in
accordance with regulations.
Material damage
!
If a flanged immersion heater is fitted and plastic pipe-
work is used at the same time, observe chapter "Speci-
fication / Fault conditions".
Material damage
!
Operate the appliance only with pressure-tested taps and
valves.
Cold water line
Copper, steel or plastic pipework are approved materials.
Material damage
!
A safety valve is required.
DHW line
Copper or plastic pipework are approved materials.
9.6.2 Water connection
f Flush the line thoroughly.
f
f Install a type-tested safety assembly. Bear in mind that, de-
f
pending on the static pressure, you may also need a pressure
reducing valve.
f Connect the DHW outlet line and the cold water inlet line.
f
f Size the drain so that water can drain off unimpeded when
f
the safety valve is fully opened. The blow-off aperture of the
safety valve must remain open to the atmosphere.
f Fit the blow-off line of the safety assembly with a constant
f
slope.
f Observe the information in the installation instructions of the
f
safety assembly.