Summary of Contents for STIEBEL ELTRON Hydro-Shark SH3-07
Page 1
HYDRO-SHARK ® MODULATING MICRO BOILERS Radiant Floor Heating Applications INSTALLATION INSTRUCTIONS FOR THE LICENSED PLUMBER & ELECTRICAN MODEL #’S: MODEL #’S: MODEL #’S: • SH3-07 • SH3-12 • SH3-29 • SH3-10 • SH3-14 • SH3-36 • SH3-19 • SH3-24 Warning: Not to be used with potable water systems...
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz Table of Contents Important General Mounting the units Fluid connections Electrical connections Technical data Troubleshooting Spare parts Warranty 13-19 Electrical & Mechanical Diagrams 20-23 Filling the System...
• The output of heat from the boiler is electronically controlled. The Boiler will deliver any water tempeture between 86° F and 140° F for the SH3-12,SH3-14, SH3-19, SH3-24, SH3-36 and 120° F for the SH3-07 and SH3-10. Please set the desired water delivery tempeture using the knob on the front cover.
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz MOUNTING THE UNIT SH3-12, SH3-14, SH3-19, SH3-24, SH3-29 & SH3-36 UNIT MUST BE INSTALLED IN A VERTICAL POSITION WITH THE WATER FITTINGS POINTING DOWNWARD, DO NOT INSTALL UNIT WHERE IT WOULD ROUTINELY BE SPLASHED WITH WATER OR ELECTRICAL SHOCK MAY RESULT. 1.
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz MOUNTING THE UNIT SH3-3 & SH3-10 UNIT MUST BE INSTALLED IN A VERTICAL POSITION WITH THE WATER FITTINGS POINTING DOWNWARD, DO NOT INSTALL UNIT WHERE IT WOULD ROUTINELY BE SPLASHED WITH WATER OR ELECTRICAL SHOCK MAY RESULT. 1.
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz FLUID CONNECTIONS NOTE: EXCESSIVE HEAT FROM SOLDERING COPPER PIPES NEAR THE BOILER MAY CAUSE DAMAGE. 1. All plumbing work must comply with the national, state, local & any other applicable codes. 2. Make sure the radiant fl oor system has been purged & is free of fl oating debris. 3.
Ground must be brought to the ‘Ground’ at the circuit breaker panel. 3. A SH3-07, SH3-10 & SH3-12 can be connected to ONE independent circuit (Figure A & B). 4. A SH3-14, SH3-19 & SHE-24 can be connected to TWO independent circuits (Figure C).
Page 8
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz Figure A SH3-07 & SH3-10 Figure B SH3-12...
“A” MODEL - 14 1/4 H X 7 7/8 W X 4 1/8 D - 1/2 PLUMBING FITTINGS MODEL VOLTS AMPS BRKR WT-LBS SH3-07 24,573 (1)40 SH3-10 32,764 (1)50 “B” MODEL - 14 1/2 H X 16 5/8 W X 4 5/8 D - 3/4 PLUMBING FITTINGS...
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz TROUBLE SHOOTING SYMPTOM POSSIBLE CAUSE SOLUTION NO HOT WATER • No Power • Utility Controlling Load • Safety thermal cut-off tripped • Reset Thermal cut-off • Not enough fl ow rate to activate unit •...
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz WARRANTY RESIDENTIAL & COMMERCIAL WARRANTY: STIEBEL-ELTRON WARRANTS TO THE ORIGINAL OWNER THAT ALL BOILERS (SH3-SERIES) WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS FOR A PERIOD OF THREE YEARS FROM THE DATE OF PURCHASE. SHOULD THE PART(S) PROVE TO BE DEFECTIVE UNDER NORMAL USE DURING THIS PERIOD STIEBEL-ELTRON, INC.
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz FILLING THE SYSTEM The pH of a system is a measure of the hydrogen concentration. The higher the reading the more basic the solution, the lower the PH the more acidic the solution. The pH scale ranges from 1-14 with a ph of 7 being neutral.
Page 21
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz I. FILLING THE SYSTEM OVERVIEW OF A TYPICAL SYSTEM A. System is assembled, it is time to fi ll it. B. Fill the system until there are no air bubbles in it. Air bubbles cause circulator pumps and element failures.
Page 22
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz 4. Attach the third hose (blue) to valve “C” located above FILLING HOSE CONNECTIONS the primary circulator. Put the other end into the fi ll tub. This valve “C”should be open allowing water to circulate through the fl...
Page 23
PHONE: EMAL: WEB: 800-355-4945 info@energyproducts.biz www.energyproducts.biz V. FINISH FILLING A. Water has turned from milky to clear. B. NO air bubbles are seen. C. Close the discharge ball valve. D. Keep pumping until pressure on the guage is 15-20 Lbs. E.
Need help?
Do you have a question about the Hydro-Shark SH3-07 and is the answer not in the manual?
Questions and answers