Installation; Positioning The Appliance; Heating Water Connection And Safety Valve - STIEBEL ELTRON HSBC 200 L Operation And Installation

Integral cylinder
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22

INSTALLATIoN

Installation
10. Installation

10.1 Positioning the appliance

f When positioning the appliance, observe minimum clearanc-
f
es (see chapter "Preparations / Installation site").
f Use the adjustable feet to compensate for any unevenness in
f
the floor.

10.2 Heating water connection and safety valve

10.2.1 Safety instructions
Material losses
!
The heating system to which the appliance is connected
must be installed by a qualified contractor in accord-
ance with the water installation drawings in the technical
guides.
Material losses
!
When fitting additional shut-off valves, install a further
safety valve in an accessible location on the heat gen-
erator itself or in the flow line in close proximity to the
heat generator.
There must be no shut-off valve between the heat gen-
erator and the safety valve.
Oxygen diffusion
Material losses
!
Avoid open vented heating systems and underfloor
heating systems with plastic pipes that are permeable
to oxygen.
In underfloor heating systems with plastic pipes that are per-
meable to oxygen and in open vented heating systems, oxygen
diffusion may lead to corrosion on the steel components of the
heating system (e.g. on the indirect coil of the DHW cylinder, on
buffer cylinders, steel radiators or steel pipes).
Material losses
!
The products of corrosion (e.g. rusty sludge) can set-
tle in the heating system components, which may re-
sult in a lower output or fault shutdowns due to reduced
cross-sections.
30
| HSBC 200 L
328453_HSBC_200_L_de_en_fr_nl_it_cs.indb 30
Supply lines
f The maximum permissible line length between the appli-
f
ance and the heat pump will vary, depending on the version
of the heating system (pressure drop). As a standard value,
assume a maximum line length of 10 m and a pipe diameter
of 22-28 mm.
f Insulate the flow and return lines in accordance with regional
f
regulations.
f Connect the hydraulic connections with flat gaskets.
f
Pressure hoses against structure-borne sound transmission:
The appliance and the heat pump are connected to each other
hydraulically via pipes carrying heating water. To reduce the trans-
mission of structure-borne sound on the water side, connect the
appliance to the heat pump with pressure hoses if these are not
already installed in the heat pump.
Pressure differential:
If the available external pressure difference is exceeded, the pres-
sure drop in the heating system could result in a reduced heating
output.
f When sizing the pipes, ensure that the available external
f
pressure differential is not exceeded (see chapter "Specifica-
tion / Data table").
f When calculating the pressure drop, take account of the flow
f
and return lines and the pressure drop of the heat pump.
The pressure drop must be covered by the available pressure
differential.
www.stiebel-eltron.com
17.10.2017 08:25:45

Advertisement

Table of Contents
loading

Table of Contents