Wacker Neuson AR Operator's Manual page 23

External vibrator
Table of Contents

Advertisement

9 Installation
Installation – cable to terminal board box
Compliance with the following steps is required when installing the cable to the terminal board
box:
NOTE
When attaching two external vibrators, ensure that they rotate in opposite directions.
1. Connect power cable as shown in wiring diagram.
2. Fit grounded conductor (only for machines of protection class rating I).
3. Fastening the seal and lid - Seal must sit correctly.
4. Terminal board box must be dust-free and dry when sealed. Tighten the screws on the lid of the
terminal board box - The screws are glued in and tightened with 3.0 Nm.
23
100_0102_is_0003.fm

Advertisement

Table of Contents
loading

Table of Contents