Minimum Venting - HearthStone Champlain Owner's Manual

Gas-fired direct vent heater
Hide thumbs Also See for Champlain:
Table of Contents

Advertisement

Hearthstone Quality Home Heating Products, Inc
where it touches the wall. Use the center of this circle
as the center point of the 10" x 10" square wall pass
through.
Cut and frame the wall for the vent pipe. Install the
horizontal vent termination on the outside of the wall.
Ensure both of the retaining straps extend through the
wall pass through to the inside of the wall.
Before attaching the vent termination to the outside of
the house, run a bead of non-hardening mastic around
the outside edges, between the vent termination and
the wall. The arrow on the end cap should point up.
Secure the cap to the wall with the appropriate screws.
Put the adjustable (11"-14") pipe into the horizontal
vent cap, (the vent pipe must extend into the horizontal
vent cap a minimum of 1 ¼"). Move the stove and vent
pipe into position, insert the adjustable (11"-14") pipe
into the 90° elbow, twist lock it.
Secure the straps from the horizontal vent termination
to the interior pipe with two sheet metal screws,
keeping the screws as close to the wall thimble as
possible. Bend or cut the excess strapping so the
thimble cover will fit properly. Screw the thimble cover
to the wall.
The adjustment range for wall thickness for
this configuration is 3"min to 9"max.
II. F
V
IREPLACE
ENTING
-40' maximum system height (without offsets)
-14' maximum offset (refer to Figures 10 - 11)
-Maximum rise to run = 1 to 5 (refer to Figures 10
-13)
-The termination must meet the requirements
outlined in Figures 7 - 9.
Figure 10: Vertical Venting Rules
I
NSTALLATIONS
III. Vertical Termination Venting
Configurations
-40' maximum system height (without offset)
Figure 11: Approved DV Vertical Co-Axial
Termination Configurations
IV. H
T
ORIZONTAL
ERMINATION
C
ONFIGURATIONS
A minimum of 24" rise is required (with or w/o
offsets)
40' maximum system height (without offsets)
Maximum rise to run = 1 to 5
The termination must meet the requirements
outlined in Figures 7 - 9. Use a vinyl siding stand
off when installing against vinyl siding.
Horizontal sections require a 1/4" rise every 12"
of horizontal run.
For each 90° elbow after the second, remove 5'
from horizontal run.
Use with snorkel termination 45" maximum
horizontal run
CHAMPLAIN Model 8304
V
ENTING
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

8304

Table of Contents