Adding Switch Point - Honeywell CENTRALINE EAGLE User Manual

Table of Contents

Advertisement

EAGLE CONTROLLER
6. Turn the rotate&push button to navigate to and highlight Valid from (start
date of valid period).
7. Enable the option by pushing the rotate&push button.
8. Turn the rotate&push button to navigate to and highlight the date.
9. Push the rotate&push button.
A calendar displays.
10. Select the date in the calendar as described in the "Scrolling through
Calendar" section.
11. Set or edit the Valid to (end date) part of the valid period in the same way as
the Valid from part.
12. Turn the rotate&push button to navigate to and highlight the OK command.
13. Push the rotate&push button to save settings.
Purpose
Add a switch point to a day which is part of the schedule.
Procedure
1. On the controller housing, press the time program operating key
TIME PROGRAMS menu displays.
BASIC OPERATION PROCEDURES
current value entry of the switched properties from the priority
array. Then the next lower value in the priority array becomes
the present value of the switched properties.
69

Adding Switch Point

. The
EN2Z-0971GE51 R0515

Advertisement

Table of Contents
loading

Table of Contents