Power Board - Siare SIARETRON 1000 Service Manual

Table of Contents

Advertisement

SIARETRON 1000 – 1100 - 3000
Service Manual
4.4

POWER BOARD

1)
Connect the power supplies to board:
the secondary of transformer (12Vac) in CN7 connector;
a rechargeable battery (12 Vdc, 3.2 Ah) in CN11 connector, respecting the polarity
serigraphically indicated;
the exit of power supply stabilized at 12V in the CN10 connector through the two ways switch,
as indicated in the following drawing:
from F020_03
Connect the testing equipment ATS.098 as indicated in the following drawing:
from F020_03
Supply the main of transformer; verify:
the commutation of K2 relay (point A of mounting plan);
that the rechargeable battery electric power increases (position the multimeter on battery poles).
SIARETRON_SE3_en
28 / (72 )
( rev.3) 30.06.2004

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siaretron 1100Siaretron 3000

Table of Contents