11
SERVICE WORK ON THE CHASSIS
11.12
Adjusting the play of the steering head bearing
11.13
Greasing the steering head bearing
11.14
Removing the start number plate
11.15
Installing the start number plate
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the handlebar cushion.
Main work
–
Loosen screws
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
Guideline
H00335-10
Screw, top triple clamp
–
Mount and tighten screw
Guideline
Screw, top steering stem
Finishing work
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
–
Mount the handlebar cushion.
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
800010-10
–
Remove screw
–
Remove screw
H00269-10
–
Position the brake line and brake line guide on the start number plate.
–
Mount and tighten screw
–
Position the start number plate.
The holding lugs engage in the fender.
–
Mount and tighten screw
Guideline
Remaining screws, chassis
H00270-10
p. 33)
. Remove screw
.
.
.
.
M8
(
p. 36)
(
p. 36)
. Swivel the start number plate to one side.
and take off the brake line guide and start number plate.
.
.
M20x1.5
12 Nm (8.9 lbf ft)
M8
17 Nm (12.5 lbf ft)
20 Nm
Loctite
(14.8 lbf ft)
p. 38)
p. 33)
M6
10 Nm (7.4 lbf ft)
39
®
243™