Replacing The Level Gauge Assy (B7) - KERN DBS Service Manual

Electronic moisture analyzer
Table of Contents

Advertisement

2.3.20 Replacing the level Gauge Assy (B7)

1. Insert flat-blade screw driver to the slit under the Level as Fig.8 and twist/remove to the Level.
Then remove adhesive from the Base.
2. Set level gauge jig on the Unibloc's top face of fixing end as Fig.9
Adjust the level adjuster until the bubble of the level gauge jig centered to the red circle.
3. Apply mix Araldite 2012 on the under side of level gauge and base. Place the level gauge on
the base. Bubbles must be smaller than the size (around 3/4) for the red circle.
4. Press the level gauge, center the bubbles on the level gauge by using finger only.
Bubble must be on the center of the red circle.
Drying time for level gauge to the base is 15~20 mins. In case of araldite rapid
DBS-SH-e-1210
Fig.8
Fig.9
Fig.10
37

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbs 60-3

Table of Contents