Replacing The Inlet Assembly (S11) - KERN DBS Service Manual

Electronic moisture analyzer
Table of Contents

Advertisement

7) Install a new power board assembly (B4) by reversing steps 1 to 5 above.
Note: When assembling, use clip CS-5 (B26) to securely hold the power board assembly (B4)
cable down toward the bottom (Fig. 18).
Note: When assembling, tighten screws of procedure 5 temporally and tighten firm after
tightening screw of procedure 2 and 3.
2.3.5

Replacing the Inlet Assembly (S11)

1) Disassemble the balance down to the case assembly (S2) by following the procedure in 2.2
Removing the case.
2)
Loosen the two screws,pan head M3x8(B52) that fasten the inlet assembly(S11).(Fig.19)
3)
Disconnect the cables connected to the J1 connector of the power board assembly(B4),(Fig.20)
Loosen the screw P4 M4x8(B53)(Fig.20)
4)
5)
Remove the inlet assembly(S11) from rear side of the base assembly(B2)
6)
Install a new inlet assembly (S11) by reversing steps 1 and 5 above.
Note:
When assembling, install the inlet assembly (S11) printed face top. (Fig.19, 20)
Note: When assembling, align the cables of the inlet assembly (S11) as shown. (Fig.20)
B52
20
B52
S11
Fig.19
B26
Fig. 18
S11
B53
B4
J1
Fig.20
DBS-SH-e-1210
B4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dbs 60-3

Table of Contents