3.3 Connecting the Hardware

To connect the three PCBs of the INA219EVM together, gently push on both sides of the D-SUB connectors (as
Figure 3-1
shows). Ensure the two connectors are completely pushed together; loose connections may cause
intermittent operation. Finally, connect the SM-USB-DIG to the SENS009 board as

3.4 Connecting the USB Cable to the INA219EVM

Figure 3-2
shows the typical response to connecting the SM-USB-DIG platform to a PC USB port for the
first time. Typically, the computer will respond with a Found New Hardware, USB Device pop-up. The pop-up
typically changes to Found New Hardware, USB Human Interface Device. This pop-up indicates that the device
is ready for use. The SM-USB-DIG platform uses the Human Interface Device Drivers that are part of the
Microsoft
®
Windows
®
operating system.
In some cases, the Windows Add Hardware Wizard will pop up. If this prompt occurs, click Yes to allow the
system device manager to install the Human Interface Drivers.
SBOU074E – JANUARY 2009 – REVISED JULY 2023
Submit Document Feedback
Figure 3-2. Response from Connecting the USB Cable
Copyright © 2023 Texas Instruments Incorporated
INA219EVM (Rev A) Hardware Setup
Figure 3-1
INA219EVM Rev A Model User's Guide and Software Tutorial
shows.
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA219EVM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents