This user's guide describes the characteristics, operation, and use of the INA210-215EVM evaluation
module (EVM). This EVM is designed to evaluate the performance of the
current shunt monitors in a variety of configurations. This document also includes a schematic, reference
printed circuit board (PCB) layouts, and a complete bill of materials. NOTE: This user guide is for the new
revision of the EVM board. For users of the original-version EVM board, see the previous EVM user's
guide, SBOU065A.
All trademarks are the property of their respective owners.
SBOU164 – July 2016
Submit Documentation Feedback
INA210-215EVM User's Guide
Copyright © 2016, Texas Instruments Incorporated
User's Guide
SBOU164 – July 2016
INA210-215
voltage output
INA210-215EVM User's Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INA210-215EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments INA210-215EVM

  • Page 1 User's Guide SBOU164 – July 2016 INA210-215EVM User's Guide This user’s guide describes the characteristics, operation, and use of the INA210-215EVM evaluation module (EVM). This EVM is designed to evaluate the performance of the INA210-215 voltage output current shunt monitors in a variety of configurations. This document also includes a schematic, reference printed circuit board (PCB) layouts, and a complete bill of materials.
  • Page 2: Table Of Contents

    ....................INA210-215EVM Hardware ....................Quick Start Setup and Use ..................... INA210-215EVM Circuit ....................Reference Voltage Setup ................INA210-215EVM Schematic and PCB Layout ......................Bill of Materials List of Figures ....................INA210-215EVM Schematic ..................... INA210-215EVM Top Overlay ..................INA210-215EVM Top Solder Mask ....................
  • Page 3: Overview

    This document provides information regarding Texas Instruments' integrated circuits used in the assembly of the INA210-215EVM. This user's guide is available from the TI web site under literature number SBOU164. Any letter appended to the literature number corresponds to the document revision that is current at the time of the writing of this document.
  • Page 4: Quick Start Setup And Use

    Quick Start Setup and Use Follow these procedures to set up and use the INA210-215EVM. For the following instructions, x = 0 to 5. Step 1. Connect an external dc supply voltage between 2.7-V and 26-V to the V+ test point TPx01 or TPx11, and connect ground reference of that supply to the GND test point TPx02 or TPx12.
  • Page 5: Reference Voltage Setup

    Ux01 Ux01 is the location for the test device. Six device boards are supplied with the INA210-215EVM board. Each board is populated with one of the available device gains. This option allows users to test the devices and determine the gain setting that is best suited for a given application.
  • Page 6: Ref Voltage Setup

    REF Pin Configuration The REF test point (Tx05 or TPx15) allows the user to configure the INA210-215EVM for either unidirectional or bi-directional operation. The INA210-215EVM has an external circuit that allows the user to connect different voltages to the REF pin.
  • Page 7: Ina210-215Evm Schematic And Pcb Layout

    INA210-215EVM Schematic and PCB Layout NOTE: Board layouts are not to scale. These figures are intended to show how the board is laid out; they are not intended to be used for manufacturing INA210-215EVM PCBs. Schematic Figure 1 shows the schematic for the INA210-215EVM PCB.
  • Page 8: Ina210-215Evm Top Overlay

    INA210-215EVM Schematic and PCB Layout www.ti.com PCB Layout Figure 2 through Figure 8 illustrate the PCB layout for the INA210-215EVM. Figure 2. INA210-215EVM Top Overlay Figure 3. INA210-215EVM Top Solder Mask Figure 4. INA210-215EVM Top Layer Figure 5. INA210-215EVM Bottom Layer INA210-215EVM User's Guide SBOU164 –...
  • Page 9: Ina210-215Evm Drill Drawing

    INA210-215EVM Schematic and PCB Layout www.ti.com Figure 6. INA210-215EVM Bottom Solder Mask Figure 7. INA210-215EVM Drill Drawing Figure 8. INA210-215EVM Board Dimensions SBOU164 – July 2016 INA210-215EVM User's Guide Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 10: Bill Of Materials

    Bill of Materials www.ti.com Bill of Materials Table 5 provides the parts list for the INA210-215EVM. Table 5. Bill of Materials Quantity RefDes Value Description Part Number C001, C005, 0.1uF CAP, CERM, 0.1 µF, 50 V, +/- 5%, X7R, 0805...
  • Page 11 TP403, TP404, TP405, TP406, TP501, TP502, TP503, TP504, TP505, TP506 U002, U102, LOW-POWER SINGLE OPERATIONAL AMPLIFIER, TS321IDBVR Texas U202, U302, DBV0005A Instruments U402, U502 SBOU164 – July 2016 INA210-215EVM User's Guide Submit Documentation Feedback Copyright © 2016, Texas Instruments Incorporated...
  • Page 12 STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 13 FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 14 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 15 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2015, Texas Instruments Incorporated...
  • Page 16: Important Notice

    IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.