INA219EVM (Rev A) Hardware Setup
3.5 INA219 Jumper Settings
Figure 3-3
shows the default jumpers configuration for the INA219EVM. Generally, the jumper settings of the
SM-USB-DIG Platform will not need to be changed, but you may want to change some of the jumpers on
the INA219_Test_Board to match your specific configuration. For instance, you may wish to set a specific I
address.
Table 3-1
explains the function of the jumpers on the INA219_Test_Board.
JUMPER
JMP1
JMP2, JMP3
JMP4, JMP5
10
INA219EVM Rev A Model User's Guide and Software Tutorial
Default Jumpers
Figure 3-3. INA219EVM Default Jumper Settings
Table 3-1. INA219_Test_Board Jumper Functions
DEFAULT
V
DUT
JMP2 (GND)
JMP4 (GND)
Copyright © 2023 Texas Instruments Incorporated
PURPOSE
This jumper determines the source for the INA219
power supply. In the Vdut position, the SM-USB-
DIG board supplies the power to the INA219. In the
Vs_Ext position, an external supply connected to
the INA219 T3 terminal supplies power.
A0 address input selection. This jumper determines
which signal is connected to the A0 pin of the
INA219.
A1 address input selection. This jumper determines
which signal is connected to the A1 pin of the
INA219.
SBOU074E – JANUARY 2009 – REVISED JULY 2023
www.ti.com
2
C
Submit Document Feedback
Need help?
Do you have a question about the INA219EVM and is the answer not in the manual?