8.2 Emergency action

Plant operators are responsible for emergen-
cy action to be taken in the plant.
In the event of a valve malfunction:
1. Close the shut-off valves upstream and
downstream of the control valve to stop
the process medium from flowing
through the valve.
2. Perform troubleshooting (see sec-
tion 8.1).
3. Rectify those malfunctions that can be
remedied based on the instructions pro-
vided here. Contact our after-sales ser-
vice in all other cases.
Putting the valve back into operation after
a malfunction
See the 'Start-up' section.
EB 8072 EN
Malfunctions
8-3