Emergency Action - Samson 2404-2 Mounting And Operating Instructions

Excess pressure cwith pilot valve
Table of Contents

Advertisement

8.2 Emergency action

Plant operators are responsible for emergen-
cy action to be taken in the plant.
We recommend removing the regulator from
the pipeline before repairing it.
In the event of a regulator malfunction:
1. Close the shut-off valves to stop the pro-
cess medium from flowing through the
regulator.
2. Perform troubleshooting (see sec-
tion 8.1).
3. Rectify those malfunctions that can be
remedied based on the instructions
provided here. Contact SAMSON's
After-sales Service in all other cases.
Putting the device back into operation after
a malfunction
See the 'Start-up' section.
8-4
EB 2540 EN

Advertisement

Table of Contents
loading

Table of Contents