Installing The Electrolytic Cell And Flow/Temp/Salinity Sensor; New Installation - Jandy APUREM Installation And Operation Manual

Table of Contents

Advertisement

Jandy
AquaPure
/PureLink™ Power Center and Cell Kit
®
®

3.7 Installing the Electrolytic Cell and Flow/Temp/Salinity Sensor

Please choose one of the following instructions to either install or replace the cell and sensor assembly.
3.7.1

New Installation

3.7.2
Replacement of Existing 3-Port Cell
3.7.3
Replacement of 2-Port (square) Cell and Sensor Tee with 3-Port Cell
NOTE: Maximum operating Pressure is 345 kPa or 50 PSI.
ATTENTION INSTALLER: If the flow/temp/salinity sensor is not installed properly, it may allow the
electrolytic cell to operate without water flow. This would cause a buildup of flammable gases resulting in
FIRE or EXPLOSION.
Mount as shown in Figure 11. This will result in the most reliable operation.
The flow/temp/salinity sensor must be mounted:
(1) In one of the available ports in the electrolytic cell
- or -
(2) In the same line prior to the cell with no valves or diverters between the flow/temp/salinity
sensor and cell.
• Anytime the flow/temp/salinity sensor is connected or disconnected and reconnected, the AC power
to the unit must be turned off and back on (Cycle Power). If power is not cycled, unreliable operation
of the flow/temp/salinity sensor will result.
3.7.1 New Installation
1.
Be sure pool pump is turned off.
2.
It is recommended that the flow/temp/salinity sensor and electrolytic cell be installed in the pool return
line after the filter and heater. The cell can be installed in either a horizontal or a vertical position. See
Figure 3.
3.
Position the flow/temp/salinity sensor and cell in the recommended position (see Figures 1, 3, 4 and 5).
4.
Locate a suitable section of pipe, approximately 17 inches (432 mm) long or follow the recommended
plumbing diagrams as shown in Figures 4 and 5. The flow/temp/salinity sensor cable and cell DC cord
must be able to reach from the power center to this section of pipe.
" (352 mm) section of the 2" (50 mm) pipe to insert the Cell. See Figure 12. Glue on
5.
Cut out a 13
/
7
8
unions and install cell.
6.
Install the flow/temp/salinity sensor into the 3-Port cell. See Figure 11.
7.
Install the strain relief provided with the electrolytic cell kit into the low voltage knock out. Feed
the connector end of the flow/temp/salinity sensor cable through the DC cord strain relief fitting. Be
certain the connector is clean and dry, then plug the cable into the connector on the power center
printed circuit board as shown in Figures 2a, 2b, and 2c. (Do not pull Flow/Temp/Salinity Sensor
cable too tight, allow a little slack).
8.
Plug the DC cord into the cell stud terminals protruding from the cell top. The DC cord can be plugged
into the cell in either direction.
To avoid risk of damage to the equipment and possible injury, it is important to make sure the DC cable
connector is fully seated on the cell stud terminals.
|
Installation and Operation Manual
WARNING
CAUTION
Page 17
Page 17
ENGLISH
ENGLISH

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plc700Plc1400

Table of Contents