Table 2–1 Recommended Bracket Alignment for 2P Drawers
Drawer
You have powered-down the system and opened the cabinet as described in Chapter 1.
Install the brackets in the cabinet as follows.
1. Install cagenuts (5) on each 2P drawer bracket (or c-channel)
2. Install cagenuts (8) on front and rear vertical rails
U locations for each 2P drawer.
3. Install cagenuts (2) on the rear vertical rails to mount the
cable brackets
4. Install each 2P drawer bracket using M6 screws
5. At the front of the cabinet, attach a shipping bracket using two M6 screws to each
vertical rail
6. Route the ground cable through the vertical rail (see Figure 2–3). Using a star
washer, terminal lug, and self-tapping screw, attach the cable to the rear surface of
the vertical rail
2.
Figure 2–3 Attaching the Ground Wire
Bracket
0
24
1
36
2
48
3
60
.
.
.
You will attach the other end to the drawer in Section 2.5, step
Cagenuts
Alignment
18, 20, 25
30, 32, 37
42, 44, 49
54, 56, 61
. Figure 2–2shows the proper
.
20
32
48
60
.
Cabling
2-5