Cleaning Co2 Gas Check Valves; Replacing Freeze Cylinder Beater Drive Shaft Bearing; Shutting Unit Down; Removing Beater Drive Motor And Beater Drive Shaft Ass'y From Unit - Cornelius 326142000 Service Manual

(solid-state) post-mix dispenser two-flavor/hot-gas defrost with v3 electronics
Table of Contents

Advertisement

CLEANING CO
GAS CHECK VALVES
2
(see Figures 2 and 13)
The CO
gas check valves must be inspected and serviced at least once a year under normal conditions and
2
after any servicing or disruption of the CO
CHECK VALVES ARE SERVICED.

REPLACING FREEZE CYLINDER BEATER DRIVE SHAFT BEARING

(see Figures 3, 8, and 14)

SHUTTING UNIT DOWN

1. Press ''DEFROST'' switch to defrost product in freeze cylinders.
2. After defrost cycle is completed, press ''OFF 1'' and ''OFF 2'' control switches to stop refrigeration system
beaters motors.
3. Disconnect electrical power to Unit.
4. Remove back and side panels as instructed.
5. Close product shutoff valve leading from product blender tank to freeze cylinder beater drive shaft will be
removed from.
6. Drain product from freeze cylinder.

REMOVING BEATER DRIVE MOTOR AND BEATER DRIVE SHAFT ASS'Y FROM UNIT

1. Remove access cover plate from back of beater drive motor for access to motor electrical terminals.
2. Tag motor electrical wiring for identification, then disconnect wiring from motor terminals,
3. Remove bolts and lockwashers securing beater drive motor to Unit frame.
4. Very carefully, remove beater drive motor from Unit. BE CAREFUL NOT TO LOSE PLASTIC COUPLER
LOCATED BETWEEN BEATER DRIVE MOTOR SHAFT COUPLING AND BEATER DRIVE SHAFT
ASSEMBLY COUPLING.
system. ALWAYS REPLACE QUAD RING SEAL EACH TIME GAS
2
FIGURE 13. CO
GAS CHECK VALVE
2
53
326142000

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fcb

Table of Contents