Housing Material
Power
Working voltage
Motor
Working temperature
Work environment
Open signal
Communication
Pass rate
Passage width
2.1 Installation notes
Please read this manual carefully before install it;
The gates must be correctly arranged in order, and the left and right gates of each lane should
be aligned;
If the equipment is used outdoors, equipment should be installed at the establishment of
100-200mm high cement platform, so as to prevent moisture, and install ceilings and other
sunscreen, rain protection facilities;
Protective earth wire must be connected;
Please confirm each RJ45 cable straight through;
Please check all wires has been properly connected before power on;
Please test all function before using.
2.2 Equipment Installation
1) Tool preparations
Swing Barrier • User Manual
≦90%, no condensation
Passive signals (relay signals, dry contact signals,)
Swing gate 600--900mm
2 Equipment Installations
9
304 stainless steel
AC220±10% V、50HZ
DC 24V
Brush DC motor 30W
-20 ℃ - 60 ℃
RS485
≦35 person/min