Equipment Installation; Installation Notes - HIKVISION DS-K3BC411X Series Quick Start Manual

Swing barrier
Table of Contents

Advertisement

Housing Material
Power
Working voltage
Motor
Working temperature
Work environment
Open signal
Communication
Pass rate
Passage width

2.1 Installation notes

 Please read this manual carefully before install it;
 The gates must be correctly arranged in order, and the left and right gates of each lane should
be aligned;
 If the equipment is used outdoors, equipment should be installed at the establishment of
100-200mm high cement platform, so as to prevent moisture, and install ceilings and other
sunscreen, rain protection facilities;
 Protective earth wire must be connected;
 Please confirm each RJ45 cable straight through;
 Please check all wires has been properly connected before power on;
 Please test all function before using.

2.2 Equipment Installation

1) Tool preparations
Swing Barrier • User Manual
≦90%, no condensation
Passive signals (relay signals, dry contact signals,)
Swing gate 600--900mm
2 Equipment Installations
9
304 stainless steel
AC220±10% V、50HZ
DC 24V
Brush DC motor 30W
-20 ℃ - 60 ℃
RS485
≦35 person/min

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ds-k3bc411x-lDs-k3bc411x-r

Table of Contents